Reservoir Access Ladder Installation — Leinster, Ireland

Project case study

Reservoir Access Ladder Installation

Client

Local authority client

Location

Leinster, Ireland

Sector

Water Industry

Duration

8 weeks design + fabrication, 1-week install

  • 30+ years delivering projects like this
  • Free site survey
  • Quote within 48 hours

30+ years

Engineering experience

EN 1090 / EN ISO 14122

Fabricated to standard

Quote within 48 hours

Free site survey

Drogheda based

Working Ireland-wide

Overview

NR Engineering delivered a complete access upgrade for a rural service reservoir, replacing legacy galvanised ladders that no longer met current standards. Scope covered internal stainless access, top-slab walkway and handrails, and secure hatched access.

Scope of works

  • Reservoir survey and access assessment
  • Stainless internal access ladder with rest landing
  • Top-slab walkway and handrails
  • Secure hatched access cover
  • Removal and disposal of legacy access
  • Installation during planned outage
  • As-built drawings and inspection records

Challenges

The reservoir served a populated area and could only be taken offline for a short planned outage window. Confined-space entry was required for the internal ladder install, and the new access had to be future-proofed for the operator's ongoing inspection programme.

Solution

All steel was prefabricated and pre-finished off-site. A confined-space-competent crew installed the internal ladder during the outage, while a second crew worked simultaneously on the top-slab walkway, handrails and hatch. Total site time was reduced to under a week.

Materials used

316 stainless ladder and cageGalvanised steel walkway gratingStainless handrail systemSecure hatched access cover

Fabrication process

All ladder and handrail components were TIG welded in our stainless workshop. Walkway grating was hot-dip galvanised by our regular Irish galvanising partner. The hatched access cover was fabricated and tested for fit before delivery to site.

Installation process

Confined-space entry procedures were followed throughout the internal ladder installation. The top-slab access was fitted with the asset on a planned outage and signed off by the operator's inspector before re-commissioning.

Project gallery

Reservoir access ladder package fabricated for an Irish service reservoir
Stainless ladder rest landing detail
Top-slab handrail system on the reservoir during install

Results

The reservoir was returned to service with a fully compliant access system, supporting the operator's future inspection programme and ensuring safe access for routine maintenance and water quality sampling.

Why NR Engineering

Why engineers and facilities managers choose NR Engineering

Three decades of design, fabrication and installation for industrial, water and construction clients across Ireland — with the paperwork, certification and programme discipline to match.

30+ Years
Engineering and fabrication experience
500+ Projects
Delivered across Ireland
40+ Clients
Repeat industrial and construction clients
Nationwide
Drogheda workshop, site teams Ireland-wide

What we guarantee

  • Free site survey and measure
  • Written quotation within 48 hours
  • Fabricated to EN 1090 / EN ISO 14122
  • Coded welders, Safe Pass certified crews
  • Agreed programme dates in writing
  • 24/7 emergency callout for maintenance clients

Client feedback

What Irish contractors and plant managers say about working with us.

NR delivered our structural steelwork on programme and to spec. Their site team integrated cleanly with our main contractor.
Operations DirectorConstruction client, Dublin
We've used NR for hygienic stainless modifications across two pharma sites. Documentation and finish are first-class.
Engineering ManagerPharmaceutical client, Leinster
Reliable callout, properly skilled crew and a workshop that can fabricate spares when OEM lead times don't suit.
Maintenance LeadFood manufacturer, Meath

Next step

Tell us what you need built, installed or maintained.

Send us drawings, photos or a short description. We'll come back with a written quotation — usually within 48 hours — and arrange a free site survey where it's needed.

  • Free site survey and measure
  • Written quotation within 48 hours
  • Fabricated to EN 1090 / EN ISO 14122
  • Coded welders, Safe Pass certified crews
CallWhatsAppGet a Quote