Stainless Steel Tank Ladder Installation — Leinster, Ireland

Project case study

Stainless Steel Tank Ladder Installation

Client

Water industry client

Location

Leinster, Ireland

Sector

Water Industry

Duration

6 weeks design + fabrication, 2-day install

  • 30+ years delivering projects like this
  • Free site survey
  • Quote within 48 hours

30+ years

Engineering experience

EN 1090 / EN ISO 14122

Fabricated to standard

Quote within 48 hours

Free site survey

Drogheda based

Working Ireland-wide

Overview

NR Engineering was engaged to design, fabricate and install bespoke 316 stainless steel access ladders on a series of treated water storage tanks for an Irish water industry client. The package included internal and external access ladders, integrated rest landings and safety cages, and was delivered inside a tight planned-outage window.

Scope of works

  • Site survey of three storage tanks
  • Fabrication drawings for sign-off
  • 316 stainless ladder fabrication
  • Safety cages, rest landings and handrails
  • Top-of-tank handover detail
  • Installation during planned outage
  • Inspection records and as-built drawings

Challenges

The tanks were in active service and could only be taken offline for a short planned outage. All fabrication had to be complete, delivered to site and ready to install in a single coordinated window. Welding had to meet hygienic standards for potable water contact and all material had to be fully traceable for the client's asset records.

Solution

We measured the tanks during a brief access window, issued fabrication drawings for client sign-off within a week, and prefabricated everything in our dedicated stainless workshop bays. Modular delivery to site allowed installation to start within hours of the asset being isolated, with all welding completed before the next inspection point.

Materials used

316 stainless steel — stringers, rungs and cage hoops316 stainless bracketsStainless A4 fixingsPickled & passivated finish

Fabrication process

Fabrication was carried out by coded TIG welders in our dedicated stainless workshop. Each ladder was assembled on a jig to maintain dimensional accuracy and welded with full WPS coverage. After fabrication, every component was pickled and passivated to restore corrosion resistance, then inspected and tagged with full material traceability.

Installation process

Installation was carried out by Safe Pass certified crews working to a permit-to-work issued by the asset operator. Modular ladder sections were lifted into position, aligned and bolted to the prepared bracket locations. Inspection sign-off was completed the same day.

Project gallery

Stainless steel tank access ladder fabrication detail
TIG welding of stainless tank ladder stringer in NR Engineering workshop
Tank ladder ready for delivery in the Drogheda workshop

Results

The asset was returned to service inside the planned outage window with full as-built documentation, inspection records and material traceability supplied to the operator. The new access systems meet current EN ISO 14122-4 requirements and are expected to serve safely for 25+ years.

Why NR Engineering

Why engineers and facilities managers choose NR Engineering

Three decades of design, fabrication and installation for industrial, water and construction clients across Ireland — with the paperwork, certification and programme discipline to match.

30+ Years
Engineering and fabrication experience
500+ Projects
Delivered across Ireland
40+ Clients
Repeat industrial and construction clients
Nationwide
Drogheda workshop, site teams Ireland-wide

What we guarantee

  • Free site survey and measure
  • Written quotation within 48 hours
  • Fabricated to EN 1090 / EN ISO 14122
  • Coded welders, Safe Pass certified crews
  • Agreed programme dates in writing
  • 24/7 emergency callout for maintenance clients

Client feedback

What Irish contractors and plant managers say about working with us.

NR delivered our structural steelwork on programme and to spec. Their site team integrated cleanly with our main contractor.
Operations DirectorConstruction client, Dublin
We've used NR for hygienic stainless modifications across two pharma sites. Documentation and finish are first-class.
Engineering ManagerPharmaceutical client, Leinster
Reliable callout, properly skilled crew and a workshop that can fabricate spares when OEM lead times don't suit.
Maintenance LeadFood manufacturer, Meath

Next step

Tell us what you need built, installed or maintained.

Send us drawings, photos or a short description. We'll come back with a written quotation — usually within 48 hours — and arrange a free site survey where it's needed.

  • Free site survey and measure
  • Written quotation within 48 hours
  • Fabricated to EN 1090 / EN ISO 14122
  • Coded welders, Safe Pass certified crews
CallWhatsAppGet a Quote